Project for implementation of the new City Hall

Questions and answers

Why decide to purchase instead of continuing to rent? 

The lease for the building located at 2555 Dutrisac Street ends in April 2019. With the building now up for sale, we were forced to consider either renting out another location or purchasing a lot. At current market prices, renting would represent an annual expense of $300,000. Building a new city hall has been part of the City’s plans for several years. However, the municipal council wished to complete other major projects first—the firehouses, arena, the Saint-Charles viaduct, the filtration plant, the water treatment plant and the future library expansion. Having been a tenant since 1977, the City of Vaudreuil-Dorion is now at the point where it is ready to build a City Hall it can be proud of.  

Where is the chosen site located?

The municipal council has chosen 405 Saint-Charles Avenue as the location for the future city hall building. Several possible locations were evaluated. However, this particular location stood out from the rest and was unanimously chosen by elected officials. The home located at 405 Saint-Charles Avenue is owned by Corporation Maurice-Ratté. The total lot is 187,740 square feet. 

What is the surface area of the building?

A firm of architects has confirmed the feasibility of constructing a building with a surface area of 11,200 square feet, which is comparable to the footprint of the neighboring building (Office municipal d'habitation). Based on our preliminary analysis, the building will likely have three floors. The total floor area wwill be approximately 33,600 square feet.

What surface area will be occupied by the future city hall building and parking lot?

According to the feasibility study, the footprint of the building, the front yard and the parking lot should be approximately 45,500 square feet, which reprensents 24% of the site's overall surface area. The City Hall will be located at the heart of Vaudreuil-Dorion, on an exceptional site that will be transformed into a park made accessible to all. The goal is to ensure that the building takes up a minimal surface area so that as much green space as possible can be left for citizens to enjoy.  

Did you consider any other sites?

Several sites were assessed, including one on Harwood Boulevard. But, in the end, the waterfront property located at 405 Saint-Charles Avenue, overshadowed all of the other options. The lot amounted to approximately $5 per square foot compared to almost $20 per square foot for the lot on Harwood Boulevard, and would leave plenty of space to create an immense park for citizens to enjoy. The other lots that were considered ranged from $18 to $30 a square foot, making them much more expensive in comparison.  

Will the new City Hall building be constructed in a flood-risk zone?  

The building will be located in the front portion of the lot, directly along Saint-Charles Avenue, and therefore outside of any flood-risk zone. Any institutional building erected in a flood-risk zone must first receive special authorization from the Ministère du Développement durable, de l’Environnement et de la Lutte contre les changements climatiques, which was not required in our case.  

Will many trees be cut down?

We will preserve as many trees as possible. An aerial view of the lot clearly shows that the area occupied by the City Hall building is minimal compared to the rest of the lot. We will also plant new trees in order to replace those that are cut in the construction process.  

How many parking spaces will be provided?

Approximately 60 employees work at City Hall. The projected parking lot will include 80 parking spaces and will be a green parking lot, which is environmentally friendly and reduces heat islands by being asphalt free.

Will you include green spaces?

Yes. In fact, the majority of the lot will be preserved and turned into a waterfront park overlooking the Bay of Vaudreuil. The entire lot will be accessible to citizens and may include community gardens, benches, swings and a site for fishing. The City already owns other waterfront property from Maison-Valois Park to Esther-Blondin Park. We are currently looking at the possibility of connecting these spaces through a boardwalk.   

Will taxes increase as a result of this project?

The project aimed at building a new City Hall has been part of the municipality’s   plans for several years. If we consider the fact that, without the new building, the city would still have to pay approximately $300,000 in rent per year, and that funds have been set aside specifically for this project, we can ensure that citizens’ tax bills will not be affected as a result of this particular project.  

When will the project be completed?

The project is expected to be completed by Winter 2019.

Parking at Centre Multisports : Long-term zone to be added

The City of Vaudreuil-Dorion has decided to establish a long-term zone in the parking lot of Centre Multisports, close by the Vaudreuil train station. “Since last Monday, we have been studying the volume of traffic at the Centre Multisports parking lot and we see that we can free up space for users of the station. We are aware that the most difficult months are December, January and February when snow obstructs the space and takes up many parking places. Starting today, we will be providing 55 long-term parking spaces. This will not solve everything, but we are fully aware of the problems faced by our residents,” stated Mayor Guy Pilon.

On March 13th, Mayor Guy Pilon held a press conference to announce a new regulation for the Centre Multisports parking lot, namely a maximum stay of four consecutive hours. This decision resulted from numerous complaints filed by Centre Multisports users in recent months.

“While we’re waiting for the station parking lot to be finished, shuttle buses or a valet parking service like Saint-Lambert are a possibility for next winter. The AMT and the MTQ have to solve the problem. The number of people using the commuter train and the A-40 is constantly increasing. The Centre Multisports clientele is also growing and there have been numerous complaints about the lack of parking space since January. We can’t ignore this very legitimate request, as the parking lot belongs to Centre Multisports. Commuter train users also have their own space. The MTQ has the power to arrive at a solution. I will make sure that they don’t forget their commitment,” added Mayor Guy Pilon.

A meeting is scheduled between the AMT and Mayor Guy Pilon at City Hall on April 13th. The Mayor will discuss parking problems and measures to ease the situation.

French status

Vaudreuil-Dorion is a unilingually French city, a status that was determined by the Government of Québec.

In order for a municipality to offer services in both official languages, half of its population must be residents whose mother tongue is English, which is not currently the case for Vaudreuil-Dorion.

Because of this status, the Charter of the French language requires that only French be used in posting, writing and publishing documents, except where health or public safety also requires the use of another language.

Déneigement

Les opérations de déneigement sont complexes et nécessitent la collaboration de tous pour être menées de manière efficace et sécuritaire.

Opérations de déneigement

Les employés du Service des travaux publics sont responsables du déneigement des stationnements municipaux et des passages piétonniers. Les voies publiques, soit 220 km de routes et 47 km de trottoirs, sont déneigées par des entrepreneurs.

Le temps requis pour compléter l’opération de déneigement, l’épandage des fondants et des abrasifs et le ramassage de la neige varie selon les conditions météorologiques. Cependant, quelles que soient les conditions, la Ville déploie tous les efforts nécessaires pour permettre la circulation sécuritaire des véhicules et des piétons.

Visionnez la capsule vidéo « Opération déneigement : faites équipe avec nous! », qui explique l'ampleur de la tâche et la façon dont les citoyens peuvent aider.

Quoi faire pour faciliter le déneigement?

Déneiger le territoire complet nécessite plusieurs heures selon la quantité et le type de précipitations reçues. Votre collaboration facilite les opérations et donc accélère l’ensemble du processus. Ainsi, on vous demande de respecter les consignes suivantes :

  • Le stationnement sur rue est interdit sur l’ensemble du territoire, entre le 15 novembre et le 1er avril, de minuit à 7 h. Des constats d’infraction peuvent être donnés par les agents de la Sûreté du Québec et de la patrouille municipale (Règlement no 1694 relatif au stationnement).
  • Il est strictement défendu de pousser la neige de votre entrée dans la rue ou sur le trottoir. Elle peut nuire à la circulation et compromettre la sécurité des automobilistes et des piétons. En plus, elle augmente inutilement les coûts de déneigement. Une amende de 200 $ pour la première infraction (somme plus élevée pour les récidivistes) pourrait vous être remise. (Règlement no 1566 sur les nuisances)
  • Lors d’averses de neige, il est fortement suggéré de ne pas laisser votre véhicule dans la rue, car il représente un obstacle pour les équipements de déneigement, sans compter qu’il peut subir des dommages (Règlement no 1566 sur les nuisances).
  • Les citoyens sont priés de ne rien laisser sur le passage des équipes de déneigement. Par exemple, placez votre bac de déchets ou de recyclage sur votre terrain et non sur la voie publique ou le trottoir sous peine d’une amende de 100 $ pour la première infraction (Règlement no 1586 sur les matières résiduelles). Évitez de déposer des choses sur les amoncellements de neige. Elles peuvent endommager les équipements de la Ville et ralentir le processus de déneigement.

Stationnements alternatifs

En raison de l’interdiction de stationner dans la rue, la Ville met à votre disposition un certain nombre de stationnements alternatifs :

  • Parc Trudeau
  • Parc de Dorion-Gardens (respecter la signalisation en place)
  • Parc de la Paix
  • Parc Esther-Blondin
  • Parc Lorne-Worseley
  • Centre Multisports
  • Parc Félix-Leclerc
  • Parc de la montée Cadieux
  • Stationnement adjacent à la caserne Forbes, sur la rue Boileau (respecter la signalisation en place)

Un projet-pilote de ligne de stationnement hivernal a été mis en place pour l’hiver 2016-2017. Selon les conditions météorologiques, le stationnement de nuit peut être permis. Téléphonez au 450 455-3372, après 17 h pour savoir si vous pouvez garer votre voiture dans la rue.

Dommages causés par les activités de déneigement

Si vous constatez que votre propriété a subi des dommages attribuables aux opérations de déneigement (pelouse ou autre), communiquez avec le Service des travaux publics à l’adresse t.publics@ville.vaudreuil-dorion.qc.ca. Vous devez transmettre votre demande dans un délai de 15 jours suivant la date où vous avez pris connaissance desdits dommages.

Les réclamations seront validées et transmises à l’entrepreneur responsable qui en assurera le suivi. En vertu de l’article 604.3 de la Loi sur les cités et villes, la Ville n'est pas responsable, pendant toute la durée des travaux, du préjudice causé par la faute de l’entrepreneur à qui des travaux de déneigement ont été confiés.

Accidents sur les trottoirs, les rues et les chemins

La Ville ne peut être tenue responsable des dommages résultant d’un accident dont une personne est victime sur les trottoirs, rues ou chemins en raison de la neige ou de la glace, à moins que le réclamant n’établisse que ledit accident a été causé par négligence ou faute de la Ville, le tribunal devant tenir compte des conditions climatiques.

Engager un entrepreneur en déneigement autorisé

Le Règlement no 1692, entré en vigueur le 6 septembre 2014, requiert que tout entrepreneur en déneigement offrant ses services pour déblayer des aires de stationnement privées détienne un permis de la Ville et en respecte les clauses. Lorsque vous faites appel au service d'un entrepreneur en déneigement, assurez-vous qu’il détient un permis de la Ville.

L’entrepreneur doit remplir le formulaire de demande et le transmette par courrier électronique à l’adresse t.publics@ville.vaudreuil-dorion.qc.ca afin d'obtenir un permis. (Vous devez enregistrer le formulaire sur votre ordinateur avant de le remplir et de l'envoyer.)

L’entrepreneur qui a obtenu un permis de déneigement des allées d'accès et des stationnements privés, mais ne figure pas dans cette liste doit communiquer avec le Service des travaux publics à l’adresse courriel précédente. Il sera inscrit dans les plus brefs délais.