Why decide to purchase instead of continuing to rent? 

The lease for the building located at 2555 Dutrisac Street ends in April 2019. With the building now up for sale, we were forced to consider either renting out another location or purchasing a lot. At current market prices, renting would represent an annual expense of $300,000. Building a new city hall has been part of the City’s plans for several years. However, the municipal council wished to complete other major projects first—the firehouses, arena, the Saint-Charles viaduct, the filtration plant, the water treatment plant and the future library expansion. Having been a tenant since 1977, the City of Vaudreuil-Dorion is now at the point where it is ready to build a City Hall it can be proud of.  

Where is the chosen site located?

The municipal council has chosen 405 Saint-Charles Avenue as the location for the future city hall building. Several possible locations were evaluated. However, this particular location stood out from the rest and was unanimously chosen by elected officials. The home located at 405 Saint-Charles Avenue is owned by Corporation Maurice-Ratté. The total lot is 187,740 square feet. 

What is the surface area of the building?

A firm of architects has confirmed the feasibility of constructing a building with a surface area of 11,200 square feet, which is comparable to the footprint of the neighboring building (Office municipal d'habitation). Based on our preliminary analysis, the building will likely have three floors. The total floor area wwill be approximately 33,600 square feet.

What surface area will be occupied by the future city hall building and parking lot?

According to the feasibility study, the footprint of the building, the front yard and the parking lot should be approximately 45,500 square feet, which reprensents 24% of the site's overall surface area. The City Hall will be located at the heart of Vaudreuil-Dorion, on an exceptional site that will be transformed into a park made accessible to all. The goal is to ensure that the building takes up a minimal surface area so that as much green space as possible can be left for citizens to enjoy.  

Did you consider any other sites?

Several sites were assessed, including one on Harwood Boulevard. But, in the end, the waterfront property located at 405 Saint-Charles Avenue, overshadowed all of the other options. The lot amounted to approximately $5 per square foot compared to almost $20 per square foot for the lot on Harwood Boulevard, and would leave plenty of space to create an immense park for citizens to enjoy. The other lots that were considered ranged from $18 to $30 a square foot, making them much more expensive in comparison.  

Will the new City Hall building be constructed in a flood-risk zone?  

The building will be located in the front portion of the lot, directly along Saint-Charles Avenue, and therefore outside of any flood-risk zone. Any institutional building erected in a flood-risk zone must first receive special authorization from the Ministère du Développement durable, de l’Environnement et de la Lutte contre les changements climatiques, which was not required in our case.  

Will many trees be cut down?

We will preserve as many trees as possible. An aerial view of the lot clearly shows that the area occupied by the City Hall building is minimal compared to the rest of the lot. We will also plant new trees in order to replace those that are cut in the construction process.  

How many parking spaces will be provided?

Approximately 60 employees work at City Hall. The projected parking lot will include 80 parking spaces and will be a green parking lot, which is environmentally friendly and reduces heat islands by being asphalt free.

Will you include green spaces?

Yes. In fact, the majority of the lot will be preserved and turned into a waterfront park overlooking the Bay of Vaudreuil. The entire lot will be accessible to citizens and may include community gardens, benches, swings and a site for fishing. The City already owns other waterfront property from Maison-Valois Park to Esther-Blondin Park. We are currently looking at the possibility of connecting these spaces through a boardwalk.   

Will taxes increase as a result of this project?

The project aimed at building a new City Hall has been part of the municipality’s   plans for several years. If we consider the fact that, without the new building, the city would still have to pay approximately $300,000 in rent per year, and that funds have been set aside specifically for this project, we can ensure that citizens’ tax bills will not be affected as a result of this particular project.  

When will the project be completed?

The project is expected to be completed by Winter 2019.

Parking at Centre Multisports : Long-term zone to be added

The City of Vaudreuil-Dorion has decided to establish a long-term zone in the parking lot of Centre Multisports, close by the Vaudreuil train station. “Since last Monday, we have been studying the volume of traffic at the Centre Multisports parking lot and we see that we can free up space for users of the station. We are aware that the most difficult months are December, January and February when snow obstructs the space and takes up many parking places. Starting today, we will be providing 55 long-term parking spaces. This will not solve everything, but we are fully aware of the problems faced by our residents,” stated Mayor Guy Pilon.

On March 13th, Mayor Guy Pilon held a press conference to announce a new regulation for the Centre Multisports parking lot, namely a maximum stay of four consecutive hours. This decision resulted from numerous complaints filed by Centre Multisports users in recent months.

“While we’re waiting for the station parking lot to be finished, shuttle buses or a valet parking service like Saint-Lambert are a possibility for next winter. The AMT and the MTQ have to solve the problem. The number of people using the commuter train and the A-40 is constantly increasing. The Centre Multisports clientele is also growing and there have been numerous complaints about the lack of parking space since January. We can’t ignore this very legitimate request, as the parking lot belongs to Centre Multisports. Commuter train users also have their own space. The MTQ has the power to arrive at a solution. I will make sure that they don’t forget their commitment,” added Mayor Guy Pilon.

A meeting is scheduled between the AMT and Mayor Guy Pilon at City Hall on April 13th. The Mayor will discuss parking problems and measures to ease the situation.

French status

Vaudreuil-Dorion is a unilingually French city, a status that was determined by the Government of Québec.

In order for a municipality to offer services in both official languages, half of its population must be residents whose mother tongue is English, which is not currently the case for Vaudreuil-Dorion.

Because of this status, the Charter of the French language requires that only French be used in posting, writing and publishing documents, except where health or public safety also requires the use of another language.

Futur hôtel de ville | Questions - Réponses

Voici des explications pouvant répondre aux interrogations des citoyens concernant le futur hôtel de ville de Vaudreuil-Dorion.
(Available in the English section)

Pourquoi avoir décidé d’acheter plutôt que de continuer à louer?

Le bail du 2555, rue Dutrisac prendra fin en avril 2019. La mise en vente du bâtiment nous obligeait à envisager une autre location ou l’achat d’un terrain. Au coût du marché, une location représenterait une dépense annuelle de 300 000 $. Le projet de construction d’un hôtel de ville fait partie de la planification de la Ville depuis des années, mais le conseil municipal désirait d’abord terminer les grands projets, soit les casernes, l’aréna, le viaduc Saint-Charles, l’usine de filtration, l’usine d’épuration et le futur agrandissement de la bibliothèque. Locataire depuis 1977, la Ville de Vaudreuil-Dorion est donc maintenant à l’étape de construire un hôtel de ville dont nous serons tous fiers.

Quel est le site retenu?

Le conseil municipal a retenu le site du 405, avenue Saint-Charles. Plusieurs terrains ont été évalués. Cet endroit se démarquait et a fait l’unanimité au sein des élus. La maison qui se trouve au 405, avenue Saint-Charles est la propriété de la Corporation Maurice-Ratté. La superficie du terrain est de 187 740 pieds carrés.

Quelle sera la superficie du bâtiment?

Une firme d’architectes a confirmé la faisabilité d’implanter un bâtiment ayant une empreinte au sol d’une superficie de 11 200 pieds carrés, ce qui est comparable à la superficie de l’empreinte au sol du bâtiment voisin (Office municipal d’habitation). Selon notre analyse préliminaire, le bâtiment devrait comporter trois étages. La surface de plancher totale serait d’environ 33 600 pieds carrés.  

Quelle superficie sera occupée par le futur hôtel de ville et le stationnement?

Selon l’étude de faisabilité, l’empreinte au sol du bâtiment, de la cour avant et du stationnement pourrait être d’environ 45 500 pieds carrés, correspondant à 24 % de la superficie du site. Le projet de l’hôtel de ville se retrouvera au cœur de Vaudreuil-Dorion, sur un site exceptionnel qui deviendra un parc accessible à tous. L’objectif est que l’empreinte au sol de l’ensemble du projet soit minimale afin de laisser un maximum d’espaces verts aux citoyens.

Aviez-vous envisagé d’autres sites?

Plusieurs sites ont été étudiés, dont le boulevard Harwood, mais celui du 405, avenue Saint-Charles, sur le bord de l’eau, a éclipsé tous les autres. Ce terrain revenait à environ 5 $ le pied carré, comparativement à quelque 20 $ pour le boulevard Harwood, et permettait la création d’un immense parc pour les citoyens. Les autres terrains envisagés coûtaient entre 18 $ et 30 $ le pied carré, donc beaucoup plus dispendieux.

L’hôtel de ville sera-t-il construit en zone inondable?

Le bâtiment sera construit à l’avant du terrain, tout près de l’avenue Saint-Charles, donc à l’extérieur de toute zone inondable. Tout bâtiment institutionnel qui serait construit en zone inondable devrait au préalable recevoir des autorisations particulières du ministère du Développement durable, de l’Environnement et de la Lutte contre les changements climatiques, ce qui n’est pas notre cas.

Est-ce que plusieurs arbres seront coupés?

Le maximum d’arbres sera conservé. La vue aérienne montre bien que l’espace qui sera occupé par l’hôtel de ville est minime par rapport au reste du terrain. De plus, nous planterons de nouveaux arbres afin de remplacer ceux qui auront été coupés.

Combien d’espaces de stationnement seront aménagés?

Une soixantaine d’employés travaillent à l’hôtel de ville. Le stationnement projeté sera composé de 80 espaces. Il s’agira d’un stationnement vert, c’est-à-dire un stationnement écologique sans asphalte afin de diminuer les îlots de chaleur.

Y aura-t-il des espaces verts?

Oui, la majeure partie de ce terrain sera préservée et deviendra un parc en bordure de la baie de Vaudreuil. Tout le terrain sera accessible aux citoyens. Il pourrait y avoir des jardins communautaires, des bancs, des balançoires, un site pour la pêche. La Ville est déjà propriétaire des terrains en bordure de l’eau, du parc de la Maison-Valois au parc Esther-Blondin. Nous examinons la possibilité de créer un lien entre ces espaces qui pourrait prendre la forme d’un boardwalk.

Y aura-t-il une augmentation de taxes?

Le projet de construction d’un hôtel de ville est dans la planification municipale depuis plusieurs années. Si on assume qu’il faudrait, de toute façon, payer environ 300 000 $ de loyer annuellement et que nous avons des argents qui seront réservés pour le projet, nous sommes en mesure d’assurer qu’il n’y aura aucune incidence sur le compte de taxes des citoyens.

Dans combien de temps le projet sera-t-il terminé?

La livraison du projet est prévue pour l’hiver 2019.